What does a complete deck cost?
TimberTech’s deck cost guide puts a simple, small-to-mid-size composite or PVC deck at an estimated $10,000–$30,000 for materials, labor, and substructure. Its larger, single-level example with railings, stairs, and some upgrades is $30,000–$60,000. These are broad manufacturer planning examples, not Salem averages or Willamette Valley Landscape prices.
For a size-based starting point, Trex’s published FAQ gives a $15–$30 per square foot material estimate covering substructure, decking, hardware, and fasteners, excluding its Signature collection. Applying that range gives the examples below. It does not cover a complete installation.
| Deck size | Area | Listed materials* |
|---|---|---|
| 12 × 12 feet | 144 sq. ft. | $2,160–$4,320 |
| 12 × 16 feet | 192 sq. ft. | $2,880–$5,760 |
| 16 × 20 feet | 320 sq. ft. | $4,800–$9,600 |
*Area multiplied by Trex’s published material range. Labor, railings, stairs, demolition, disposal, permits, and other site work need separate pricing. Product and local costs vary. Confirm available materials when requesting your estimate.
The installed-project examples and the material table answer different questions. Do not add them together or treat a material subtotal as a finished-deck quote.
Keep a sound frame or price a full rebuild.
Replacing worn boards can involve less work than building from the footings up. But the existing frame must be suitable for the chosen decking. Have supports, connections, the house attachment, stairs, and rails assessed before relying on a resurfacing budget.
Surface replacement
Retain a suitable structure and replace the specified boards, fasteners, and finish details. Confirm any framing adjustments needed for the new material.
Full replacement
Include removal and disposal, then the new footings, framing, surface, rails, and stairs. Identify what happens if removal exposes damage at the house.
New or expanded deck
Price the new footprint and its connection to doors, yard levels, and walking routes. Extra usable area can also require different supports and access.
The decking service page explains repair-versus-rebuild decisions and how the structure, surface, and layout fit together.
Height and edges can change the total.
Two 192-square-foot decks can need very different work. A low rectangular platform with easy access differs from a raised deck with a long stair run, more railing, or several levels. Ask for railing length and stair details alongside deck area; neither is fully described by the square footage of the walking surface.
Material is another decision, not the entire budget. Compare wood, composite, and PVC options by the specified product, fastening system, edge finish, and care requirements. Wood can bring periodic refinishing; manufactured decking still needs appropriate cleaning. Allow for ongoing care rather than assuming any surface is maintenance-free.
Reduce complexity before cutting usable space.
Ask how a simpler outline, fewer level changes, or a different railing choice would change the estimate. Keep enough room to pull out dining chairs and walk between your door and stairs.
Account for access, water, and permit review.
A narrow side gate, soft access route, old concrete footings, or a difficult demolition path can change labor and hauling needs. Show where materials can enter your yard, and point out downspouts, pooling, irrigation, and any visible decay before the scope is set.
The City of Salem’s deck guidance says a permit is required when decking is more than 30 inches above adjacent grade, measured at any point within three feet horizontally. It also directs you to discuss setbacks, height, lot coverage, and other land-use requirements with Planning. Confirm the rules for your address rather than assuming a low deck has no review requirements.
Willamette Valley Landscape serves Salem, Keizer, and other listed service areas. Outside Salem, use the responsible city or county’s guidance. Clarify who handles plans, applications, fees, and inspections, and how those steps affect the schedule.
Make the quote describe the finished deck.
Share approximate dimensions, height above the yard, intended use, and whether the deck is new or existing. Include wide photos from the yard toward the house and from the door outward. Note any movement, damaged boards, or loose rails without entering an unsafe area.
The estimate should distinguish retained structure from new work and name the decking, railings, stairs, removal, disposal, permits, cleanup, and exclusions. Ask how concealed damage would be documented and approved before extra work proceeds. Request care instructions and any applicable product or workmanship warranty terms in writing.
If a ground-level gathering area would work just as well, compare a patio or other hardscape option for the same furniture layout and connection to your home. A lower material price alone does not establish the lower installed cost.
Deck cost questions.
What is the average cost of a 12-by-12 deck?
A 12-by-12 deck is 144 square feet. Applying Trex’s published $15–$30-per-square-foot material range gives $2,160–$4,320 for the listed materials, not an installed deck. Labor, railings, stairs, removal, permits, and site-specific work still need to be priced for your home.
How much does a 12-by-16 Trex deck cost?
At 192 square feet, the same manufacturer material range gives $2,880–$5,760 before labor and other project costs. The chosen product line, framing condition, railings, stairs, and installation details determine the actual estimate. This is a budgeting example, not a Willamette Valley Landscape rate. Ask which materials are available for your project.
Is replacing deck boards cheaper than rebuilding?
Keeping a suitable existing structure can reduce the work, but resurfacing only makes sense after the frame, footings, connections, stairs, and rails have been assessed. New boards do not fix structural damage. Have the estimate identify what will remain, what will be replaced, and how concealed damage will be priced if discovered during removal.
Which costs more: a deck or a patio?
The site and finished scope decide the comparison. A patio needs ground preparation, drainage, and a suitable finished elevation; an elevated deck needs a supporting structure and may need stairs and railings. Compare both options for the same usable area, door connection, access, and upkeep rather than comparing board prices with paver prices.
Get an estimate for your deck.
Tell Willamette Valley Landscape where your home is, what you want the deck to make possible, and whether you are replacing boards, rebuilding, or starting fresh.